University of Cambridge > Talks.cam > Cambridge Geotechnical Society Seminar Series > Re-engineering of A5 Glyn Bends Cutting, Corwen

Re-engineering of A5 Glyn Bends Cutting, Corwen

Add to your list(s) Download to your calendar using vCal

If you have a question about this talk, please contact Stefan Ritter.

In May 2006, the Glyn Bends section of the A5 trunk road was closed to traffic because there was concern regarding the stability of the rock cutting, supported by anchorages at 70° from horizontal. Many of the original anchorages were at risk of failure due to corrosion because of as installed details. Following road closure, it was necessary to re-engineer the cutting by re-grading the north face to a safe angle that did not require anchorage support, and re-anchoraging of the south face.

This presentation discusses the findings of the investigation of the failures of the original anchorages and the re-engineering of the cutting. The solution adopted was the one with the lowest level of risk, in terms of cost, programme and safety issues

The road was reopened to traffic in July 2007

This talk is part of the Cambridge Geotechnical Society Seminar Series series.

Tell a friend about this talk:

This talk is included in these lists:

Note that ex-directory lists are not shown.

 

© 2006-2024 Talks.cam, University of Cambridge. Contact Us | Help and Documentation | Privacy and Publicity